DBB
LBB
DFR
LCY
LFR
BOK
BEE
BWD
MOO
CHP
The installer, contractor or other registered professional of record will be required to pre-plan the placement of the siding panels, tubes or other Longboard products and create site specific shop drawings to reflect site conditions. The distribution of off-cuts and the calculation of waste is also the responsibility of the installer, contractor or other registered professional of record.