Case Studies

AllCommercialHospitalityEducationHealthcare

North Vancouver’s Brand New Facility is Changing the Future of Search & Rescue

Old Walls, New Standard: How A+N Installed Longboard Over Imperfect Stucco and Won a 2026 Architectural Excellence Award Doing It

OC Vibe

Design, Durability, and Detail at OC Vibe

5 Common Installation Mistakes That Lead to Callbacks (And How to Avoid Them)

Complete Manufacturing Control | The Longboard Advantage

Why Longboard is the Best Material Option for Florida

6 Steps to Reading Span Charts Effectively

Architectural Excellence Awards 2026

Boost Your Space’s Value with Stunning Outdoor Landscaping Design

The Versatility of Latimer Lake: Can an industrial building actually feel comfortable and inviting?

SORA West: The Transformation From Mill Town to Modern Hub

The Warm Sophistication of Phantom Creek Winery

OpusCare: Clean Lines and Calm Design in Healthcare Architecture

Brand Architecture Spotlight: Jollibee – Henderson, Las Vegas

Design Highlight: WSKY Stadium / Starbucks, Las Vegas, NV

People Come First: Inside and Outside the Workplace

Avoid These 5 Mistakes on Your First Longboard Install

Crafting Interior Designs: Longboard’s Role in Hospitality Design

Natural light, flexible spaces, and a team-friendly design: Step inside BPA’s transformed HQ.

Brookline High School - High Res-15

Over the Tracks and Into the Future: Andy Jonic, Brookline High, and the Quiet Reinvention of a Boston Suburb

Speak with a trusted advisor

to discuss your project goals and design needs

Scroll to Top
picture of a cladding attachment system, fully installed with girts attached for cladding.
GET YOUR FREE SPACING CALCULATOR

HITCHâ„¢ Cladding Attachment System

* Your document will download automatically on submission